Skip to product information
1 of 5
Verified Authentic
Save 10% with codeVAULT

Chrome Hearts

Ntfl Wbs Fumochi Silver Ring

Ntfl Wbs Fumochi Silver Ring

Size US 4.5 | EU 48

Regular price $2,280 USD
Retail Price: Regular price Sale price $2,280 USD
SALE SOLD OUT
Shipping calculated at checkout.

Condition Grades
New Excellent Very Good Good Fair
Size: No. 11
(11 JP / US 6) Size Inner diameter 16.53 mm (0.65 in)
Condition Rank: B (Item with signs of use)
Description: There are small scratches and scratches here and there.
Quality 925
Brand: Chrome Hearts
Item: Ring
Name: NTFL W NTFL w BS Fumochifu Silver Ring
Color: Silver
Weight: 4.85 g

Condition Guide:
S: Like new by the store's standards
SA: Almost unused, overall pristine
A: Excellent condition
AB: Great condition, minor signs of use
B: Good condition, signs of wear from normal use
C: Noticeable scratches, dirt, or signs of use
D: Heavily damaged or in need of repair
This is an authentic Chrome Hearts Ring in silver. The ring features a circular design with intricate cross motifs etched around the band, creating a bold and distinctive look.

The Reluxe is not affiliated with any of the brands available for purchase.

View full details